Sunday, April 10, 2011

Crafting Withdrawal

I had spring break planned perfectly!  I would work on a few minor projects for the first couple of days, clean my craft cave, and then craft away for at least a day...or two (okay, maybe just evenings, but it was wishful thinking!).  What was NOT in my plans, was an entire bathroom renovation!  What started as a small toilet leak, led to pulling everything, and I do mean EVERYTHING, out of the bathroom and redoing the entire room. 
Well, after multiple trips to the home improvement store, local hardware store, etc., etc., the bathroom is done and presentable.  I LOVE the new flooring, vanity, paint, moulding, and even the towel and toilet paper holders.  While the project took away any hope of crafting I had budgeted during my vacation, this new bathroom is a project that we've been talking about doing for a few years...it just took a leaky toilet to MAKE us do it!
 For anyone wanting me to come help them redo their bathroom now, please hire someone.   I love designing, but I swear my husband and I hated each other at times during this project. :o)  Though, I must admit, we worked way better together on THIS bathroom than the other one we redid two years ago...there is hope! We use the new "Allure" flooring, which is kind of like a floating floor, much like Pergo, but specifically made for bathrooms (25 yr warranty).  I love how it looks, and in a larger room, I know it would be MUCH easier to install.  It says it's easy to cut, but it proved a bit challenging to have exact matching grout lines.  We were going to use DuraCeramic Congoleum, but there was none available without ordering online.  We loved working with that product last time, and it holds up phenomenally!
 I promise I will get back to adding more of my projects here, soon!  I've been doing more "crafting on demand" for people who NEED a  card ASAP, than having time to enjoy and create posts.  I need to change that for my own sanity-sake!  ~Hoppy Crafting!  

No comments:

Post a Comment